
Ero Copper Corp., a base metals mining company, engages in the exploration, development, and production of mining projects in Brazil. It engages in the production and sale of copper concentrate from the MCSA Mining Complex located within the Curaçá Valley, northeastern Bahia state, as well as gold and silver byproducts. The company also holds a 100% interest in the Boa Esperança property, a copper development project located within southeastern Pará state; and NX Gold property located in Mato Grosso state. Ero Copper Corp. was incorporated in 2016 and is headquartered in Vancouver, Canada.
Ero Copper Corp. trades as ERO on NYSE. The company is classified in Basic Materials / Copper and reports in USD.
The current profile places the business in Copper. This section is intended to summarize the operating segments, products, geographies, and main revenue lines from official filings.
Latest available fiscal data shows $799.60M of revenue and $268.34M of net income.
Use this area for management strategy, capital allocation priorities, target markets, and measurable goals from the latest annual report or investor presentation.
The app now provides the structure, but exact strategic claims should come from official company documents before being treated as a finished investment thesis.
Ero Copper Corp. can be compared against peers such as Ashland Inc., The Chemours Company, Centerra Gold Inc., Constellium SE, DRDGOLD Limited, Elevra Lithium Limited.
A complete thesis should compare growth, margins, balance-sheet risk, valuation multiples, and market position against direct competitors.
Current signals to investigate include market capitalization of $2.69B, beta of 1.56, and return on equity of +28.7%.
This section should be validated with evidence such as durable margins, brand strength, regulation, switching costs, cost advantage, distribution, or technology.
Key risks should include financial leverage, cyclicality, customer concentration, regulatory exposure, currency risk, and execution risk.
ERO currently shows total debt of $631.20M and beta of 1.56. Missing data should be treated as a research gap, not as low risk.
Production-capacity detail is not available as structured data yet. For industrial, defense, semiconductor, or real-estate companies, this should be reviewed from annual reports and investor presentations.
No structured backlog field is available yet. If the company reports backlog, review the relevant filing section before adding it to the thesis.
Use this section for major contracts, product launches, construction projects, acquisitions, or strategic programs that can materially affect valuation.
Recent filings to review: 6-K (2026-05-20 00:00:00), SC 13G/A (2026-05-06 00:00:00), SC 13G/A (2026-05-06 00:00:00), 6-K (2026-05-04 00:00:00).
Customer concentration is not available as structured data here. Add it from official filings when a company discloses material customers or revenue concentration.
Supplier concentration and critical supply-chain dependencies are not available as structured data here. This should be researched from annual reports and risk disclosures.
Company website: https://www.erocopper.com
For US-listed stocks, verify the thesis against official filings, earnings call transcripts, and company investor relations materials.