Andina Copper Intersects 292m at 0.48% Cu from 44m

April 21, 2026 – TheNewswire - Vancouver, British Columbia. Andina Copper Corporation (TSX-V: ANDC | FSE: FIR | OTCQB: PMMCF) is pleased to report an outstanding drill intercept from CDH007, the second hole completed from a new step-out drill pad at the Cobrasco Project in Chocó, Colombia. Following the high-grade Cu-Mo intersections reported in recent drillholes CDH003 to CDH005 ( refer March 24, 2026 News Release ), a new step-out drill pad was collared to test the continuity and extension of the Cobrasco Central mineralized system to the northwest. Drillhole CDH006 was drilled to the southwest along this new section line intersecting 232m @ 0.68% Cu, 75ppm Mo, 2 g/t Ag from 38m ( refer April 14, 2026 News Release ). Hole CDH007 was drilled from the same pad to the northeast, in a section line parallel to previous holes CDH001 and CDH004.
Open original source