NG ENERGY ANNOUNCES SIGNIFICANT NEW GAS DISCOVERY IN SINU-9 BLOCK IN COLOMBIA

Pre-CDO–San Cayetano interval discovered during drilling of the Hechicero-1X well with a net pay of 103 ft. Initial well tests from this interval delivered a production rate of 26.4 MMcf/d on a 43/128 choke with 1,800 psi well-head pressure.
Open original source