Midnight Sun Extends Dumbwa Copper Deposit to Over 5.3 Kilometres; Remains Open Along Strike with Drilling Ongoing

Results include: 93m @ 0.40% Cu, 80m @ 0.39% Cu, 44m @ 0.53% Cu, and 36m @ 0.58% Cu Results include: 93m @ 0.40% Cu, 80m @ 0.39% Cu, 44m @ 0.53% Cu, and 36m @ 0.58% Cu
Open original source