Cartier Cuts 2.1 g/t Au Over 19.1 m at Main Sector (Cadillac); Confirming Multiple Parallel Gold Zones Near Surface

VAL-D'OR, Quebec, June 02, 2026 (GLOBE NEWSWIRE) -- Cartier Resources Inc. (″Cartier″ or the ″Company″) (TSXV: ECR; FSE: 6CA; OTCQB: ECRFF) is pleased to announce the twelfth batch of results from Main Sector from the 100,000-m drilling program on its 100%-owned Cadillac Project, located in Val-d'Or (Abitibi, Quebec). Strategic Highlights from Main Sector Drill Hole Results (Figures 1 to 3) CA26-595 reported 2.1 g/t Au over 19.1 m including 19.6 g/t Au over 1.0 m and CA26-597 graded 1.4 g/t Au over 16.0 m including 9.8 g/t Au over 1.0 m (5B4 Zone).
Open original source