Arbor Metals Completes Phase 1 2026 Drilling At Jarnet Lithium Project

Vancouver, Canada – April 13, 2026 – TheNewswire – Arbor Metals Corp. ( “ Arbor ” or the “ Company ”) ( TSXV: ABR, FWB: 432) is pleased to announce the completion of its Phase 1 2026 diamond drilling program at its wholly owned Jarnet Lithium Project, located in the Eeyou Istchee James Bay region of Quebec, adjacent to Patriot Battery Metals' Shaakichiuwaanaan Property (formerly the Corvette Project). A total of 5 holes totaling 1,433 meters were drilled. Samples were sent to ALS Laboratories in Sudbury, Ontario. Results are expected in the near term. The 2026 Phase 1 drill program was designed to build on promising lithium mineralization identified during the 2025 exploration programs. Drilling efforts were concentrated on the Jarnet 2 claim block, where holes JAR26-37 to JAR26-39 targeted a prominent linear lithium anomaly identified in the 2025 Bark Sampling program. Holes JAR26-40 and JAR26-41 were drilled to build on elevated lithium values from 2025 drilling which yielded several significant lithium-bearing pegmatite intercepts, with the goal of extending both strike and depth of the lithium mineralization identified in the 2025 program.
Open original source